About the Carrier

Our client is one of Canada’s largest telecommunications companies, providing a full suite of wireless, internet, and business solutions to millions of customers from coast to coast. With a multi-billion dollar investment commitment in Alberta alone over its current five-year cycle, the carrier’s core focus is expanding its 5G network, deploying fibre broadband, and upgrading existing infrastructure to meet the growing demands of urban and rural customers alike.

As a national leader in 5G deployment, the carrier continuously invests in network capacity and modernization to deliver faster, more reliable wireless service — particularly in high-density environments where performance matters most.

Goal

  • Upgrade wireless infrastructure at one of Canada’s highest-demand public venues

  • Expand 5G capacity and network readiness ahead of the 2023 Stampede season

  • Meet a firm, event-driven in-service deadline with zero tolerance for delay

Solution

  • Full sector addition and equipment modernization at the Calgary Stampede Grandstand

  • Shop-fabrication of the complete antenna structure at Pillar’s Calgary facility, transported and craned to the rooftop

  • Installation of Galtronics RET Multibeam antennas, 35 RRUs, fibre and DC infrastructure, and full grounding to carrier standards

Outcome

  • Network fully operational before the 2023 Stampede opening day

  • Zero safety incidents across the full project

  • One of the largest wireless infrastructure upgrades of its kind in Western Canada

About the Calgary Stampede

The Calgary Stampede is one of the world’s most iconic annual events, drawing over 1.3 million visitors each July for ten days of rodeo, chuckwagon racing, concerts, exhibitions, and western culture. Known as “The Greatest Outdoor Show on Earth,” the event set an all-time attendance record with nearly 1.5 million visitors across the ten-day run — with single-day attendance exceeding 200,000 guests. Beyond the annual Stampede, the grounds host over 2.5 million attendees annually across more than 1,000 events.

With 150,000+ visitors on-site on any given Stampede day, the wireless demands rival those of a small city — with tens of thousands of guests simultaneously streaming, sharing, and transacting on their devices. For a major Canadian carrier, ensuring network capacity and signal quality at the Calgary Stampede is a high-profile, mission-critical infrastructure challenge.

Challenge

The Calgary Stampede Grandstand presents one of themost logistically demanding wireless upgradeenvironments in Western Canada. With over 150,000 visitors on-site on peak Stampede days, the venue places extraordinary demand on wireless networks — and the carrier required a significant capacity expansion to be fully operational before the event’s opening day. That deadline was absolute: the Stampede opens on a fixed date each year, with no flexibility.

The Grandstand’s active, high-profile status meant on-site construction time had to be minimized. Extended rooftop access was not feasible across a normal construction timeline, and the complexity of the installation — new antennas, 35 RRUs, diplexers, fibre and DC trunks, fuse panels, patch panels, and CDUs, alongside full legacy removal and roofing coordination —demanded a solution that could compress on-site exposure without compromising quality or carrier acceptance standards.

The carrier engaged Pillar Telecom to deliver the build, with the approach calling for the antenna structure to be fabricated off-site and craned to the Grandstand rooftop in a single coordinated lift — compressing on-site exposure and protecting the firm in-service deadline.

Project Solution

The carrier engaged Pillar Telecom to execute the full on-site build scope at the Calgary Stampede Grandstand. The scope of work included:

  • Structural Assessment — Full structural assessment of the Grandstand rooftop to confirm load capacity and mount design for the new antenna assembly.

  • Pre-Fabrication — Fabrication and assembly of the antenna structure at Pillar’s Calgary shop, enabling a single coordinated crane lift to rooftop and dramatically reducing on-site exposure at the active venue.

  • Antenna & RRU Installation — Installation of three Galtronics GP7136-08031 Remote Electrical Tilt (RET) Multibeam Antennas — high-capacity, patented 4×4 MIMO stadium antennas purpose-built for dense venue environments — alongside 35 new RRUs with diplexers.

  • Fibre & DC Infrastructure — Supply and installation of new fibre and DC trunks, fuse panels, fibre patch panels, and CDU equipment to support the expanded network capacity.

  • Legacy Removal & Site Works — Full removal of legacy equipment and mounts from the northwest wall, roofing coordination, craning, and grounding to carrier standards.

  • Testing & Commissioning — Comprehensive antenna and fibre optic testing across all new installations, with full close-out documentation completed upon handover.

Pillar managed the full on-site build — from initial mobilization through to final commissioning — coordinating crane logistics, rooftop access, and multi-trade execution to meet the carrier’s in-service deadline, delivering the complete scope on time and on budget with the network fully operational before the gates opened on the 2023 Stampede.

KEY OUTCOMES

35

New RRUs Installed

3

RET Multibeam Antennas Commissioned

1

Shop-fabricated structure, craned to rooftop

0

Safety Incidents
client
Major Canadian Carrier
delivered by
Pillar Telecom
project type
5G Sector Addition & Equipment Modernization
location
Calgary Stampede Grandstand, Calgary, Alberta
COMPLETED
June 2023
SCOPE
Structural analysis, pre-fabrication, antenna install, RRU deployment, fibre & DC trunks, fuse panels, fibre patch panels, CDUs, legacy removal, roofing coordination, craning, grounding
antenna technology
Galtronics GP7136-08031 RET Multibeam (4×4 MIMO)
venue capacity
Over 150,000 visitors per day during Stampede
notable
One of the largest wireless infrastructure upgrades in Western Canada
Results / Benefits

The Calgary Stampede upgrade was delivered on time, on budget, and with zero safety incidents — meeting a firm, immovable deadline with the 2023 Stampede opening day as the in-service date. Pre-fabricating the entire antenna structure at Pillar’s facilities before transporting and craning it to theGrandstand rooftop was central to hitting that deadline, minimizing on-site time at one of Calgary’s busiest and most access-restricted venues.

The completed installation dramatically expanded the Grandstand’s wireless capacity and 5G readiness, ensuring the network could handle the demands of over 150,000 visitors on peak Stampede days. The project stands as one of the largest wireless infrastructure upgrades of its kind in Western Canada, and was recognized by Galtronics — the antenna manufacturer — as a flagship deployment of their GP7136-08031 RET Multibeam technology in a high-density stadium environment.

Pillar Telecom’s successful delivery on this project demonstrates the trust carriers place in Pillar as a build partner capable of executing complex, high-profile wireless upgrades under firm event-driven deadlines — in some of Canada’s most demanding and logistically constrained venues.